Air pollution control serious accountability


Posted On Mar 21 2017 by

the morning of October 9th, the Xining Municipal Committee, Municipal Commission for Discipline Inspection Secretary Ma Haiying led the Municipal Supervision Bureau, Municipal Environmental Protection Bureau, the municipal supervision office and other departments, has come to the 7 on-site supervision and inspection of air pollution remediation work. Aiming at the problems found in the inspection, Ma Haiying stressed that the city’s various departments at all levels should conscientiously implement the atmosphere of Xining city and the comprehensive management of water pollution will promote the work requirements, in accordance with the who’s in charge, who is responsible for the principle of territorial management, strictly implement a responsibility system, will not allow the division of responsibility is unclear, unknown, stall, explain away. Occurs, the consequences will be serious working poor accountability.

check, for the airport high speed along the demolition site did not set Weidang, no sprinkler dust and building demolition waste dumps, Ma Haiying asked for the north area of rectification; Qinghai Ge Sanghua biological Polytron Technologies Inc in the control of dust pollution is effective, Ma Haiying hope that the city’s construction site to learn from the company’s practices and experiences; biological science and Technology Industrial Park two site demolition site is not set Weidang, without dust problems such as sprinkler, Ma Haiying requirements for rectification; according to the traffic impact huzhulu scheduling problem of laying pipe network, Ma Haiying site coordination of the city traffic police detachment, from now until the end of the month every night on the road rhyme ieguchi toll station to Kangle hospital evacuation vehicles; not to rhyme ieguchi resettlement area, Liyuan area construction site For sprinkler dust, road hardening, not pulling muck cars without cleaning, construction sites and bare slope protection problems of building materials piled up at random, Ma Haiying asked the East District and Liyuan area departments attach great importance to the rectification of responsibility. (author: Jia Quanjun)

 

Last Updated on: March 21st, 2017 at 1:57 am, by


Written by admin


Leave a Reply

Your email address will not be published. Required fields are marked *